Commercial Projects
As you can see from our project’s portfolio, we have carried out the installation of many different types of metal stud partitioning.
Some of the commercial projects we have completed recently include Montrose Road in Chelmsford and Raans Road in Amersham. Both of these developments were for Harmonix Construction, who we still have a great relationship with, and with who we continue to work together successfully.
The types of walls installed here were varied, from 70mm metal stud walls dividing up the office and welfare areas, to the huge jumbo walls dividing up the commercial space. These were mostly constructed using a 146mm stud, due to the height, with a concealed security mesh fitted to each wall. All of our operatives have mechanical platform training and all carry their cards with them. We believe it makes no sense to have two operatives on a scissor lift when only one can drive it.
Housing Developments
Our housing development side installs mile after mile of 48mm and 70mm partitions to new build housing developments, for several of our clients, Jarvis, Lovells, Stratford etc, and we can either plaster skim finish these walls, or tape and joint them, depending on the clients’ requirements.
This quick and easy method of wall construction is far more popular than timber partitions, as there is little chance of cracking with the metal construction, and there is far less weight.
Our acoustic partitions on apartment developments in places such as Mill Hill, Barnet, West Drayton and St Albans have all stood up to the sound reduction requirements specific to each project, and have always, always, passed the sound test when one is carried out Get in touch if you need some of this light and easy partitioning installed on your project, or ask us for references from any of our clients.
A couple of examples of high-profile work
One Hotel, Mayfair
In December 2022 we completed our works on a new 8-story, 181-bed and suite 5* Hotel in London’s Mayfair, One Hotel. This was for County Contractors, and their attention to detail was extraordinary. We installed the acoustic party walls to all areas, plus internal bathroom walls and acoustic ceilings, to an incredibly high Knauf specification, and laid over 6,500m2 of floor screed on an acoustic base.
Harmonix Construction
In early 2023 we completed the office walls and ceilings to a new development of 10 commercial units for Harmonix Construction in Witham, Essex, and will soon be commencing all of the walls and ceiling installation on a new 5-story storage unit in High Wycombe for the same company
Top Quality
All our work is carried out to the very highest standards by our skilled plasterers and we are always happy to provide honest and professional advice based on our experience in the trade. Get in touch now to get a free quote.
Hickey Limited specialise in the full range of domestic and commercial plastering services which include dry-lining, Partitions, screeding, ceiling repairs, Raised Flooring and general plastering.
Check out our Instagram to see all of the Monocouche render project photos. This popular system of external render is now one of our busiest sections. We can apply many systems, from Weber, Parex and K Rend, and can also apply insulated systems where required.